[1]
Skawina, B. and Salama, A. 2021. Analyzing the Electricity Consumption and Costs of Electrical-Powered Machines When There is Orepass Failure in Underground Mine. Tanzania Journal of Science. 47, 1 (Feb. 2021), 180–193. DOI:https://doi.org/10.4314/tjs.v47i1.16.